Management of Change in a Safety Management System

This page is a placeholder. The article has not been written yet.

Planned scope. Applying a structured change process to a software, procedure, or equipment change, including a move from paper to electronic records.

Regulatory anchor. ISM Code sections 1.2.2.2 and 12

Cluster. Shipboard roles, the ISM Code and the SMS. Catalogued in research/kb-gap-analysis-conventions.md.

Until this page holds an article it carries a noindex directive and is kept out of the sitemap and the feeds. Every planned page is listed at the knowledge base index.