Reconciling the Bilge Holding Tank Against Code D and Code E Entries
This page is a placeholder. The article has not been written yet.
Planned scope. Inflow from bilge wells, outflow to separator or ashore, and the sounding that must agree with both.
Regulatory anchor. MARPOL Annex I Reg 12, Reg 17; Appendix III Codes D and E
Cluster. MARPOL Annex I and the Oil Record Book Part I. Catalogued in research/kb-gap-analysis-depth.md.
Until this page holds an article it carries a noindex directive and is kept out of the sitemap and the feeds. Every planned page is listed at the knowledge base index.