Slop Tank Decanting: Settling Time, Interface, and the Discharge Decision

This page is a placeholder. The article has not been written yet.

Planned scope. Settling period, use of the oil and water interface detector, the discharge criteria check, and the entry.

Regulatory anchor. MARPOL Annex I Reg 29, Reg 32, Reg 34

Cluster. MARPOL Annex I and the Oil Record Book Part I. Catalogued in research/kb-gap-analysis-depth.md.

Until this page holds an article it carries a noindex directive and is kept out of the sitemap and the feeds. Every planned page is listed at the knowledge base index.